top of page
51469e_f5f67dee045840c6b4d6ab1e0b7f0fe8.

BETTER BILLY BUNKER CERTIFIED INSTALLER

HOW IT WORKS

With Better Billy Bunkers, high maintenance liners are a thing of the past! A layer of drainage rock lines the entire bunker preventing washouts. The gravel is then bound together with a specialized polymer. The application allows drainage at over 2400" per hour. There is no chance of standing water, it eliminates mid-slope wash outs, controls contamination and prevents rock migration, leaving the bunker playable, even after the heaviest of rain falls. 

INSTALLATION

Installation of Better Billy Bunkers is a simple 2 step process. No heavy equipment is required for installation, no covering is required and the bunker is ready for sand the following day. 

DURABILITY

Better Billy Bunker is a flexible application that is ideal for freeze/thaw cycles. The drainage rock layer allows for movement. They are also safe for use with mechanical bunker rakes. Better Billy Bunkers are backed with a 10 year warranty and an expected 25 year life span. 

BUNKER COST

Better Billy Bunker offers a return on investment in as little as 3 years. Labour and material costs of maintaining and repairing bunkers accounts for a n average of 10% of a clubs maintenance costs. With the BBB advantage, clubs will experience tremendous maintenance savings!

bottom of page